Projects

One development programme, from pilot to commercial deployment.

An iterative engineering development programme, progressing from pilot-scale validation through integrated demonstration to industrial deployment.

Concept visualisation of a future Avioxx commercial facility.

Development programme

From innovation to industrial deployment.

  1. Catalyst

    Pilot · Runcorn

    Operating since 2024

    Develops and tests the process

    NextHigher fuel volumes and molecular design for 100% drop-in SAF

  2. Genesis

    5,000 t/yr

    In development · target 2029

    First integrated plant

    NextPre-FEED and FEED with NIRAS

Play video: Project Catalyst: SAF production update

Project Catalyst

Our pilot facility in Runcorn.

Operating

Where the process is developed, tested and improved.

2024

Operating since

X25

Avioxx-designed reactor

SOFC

Fuel-cell testing

Project Catalyst

Play video: Avioxx SAF production plant, Cheshire

Project Genesis

A 5,000-tonne demonstration plant.

In development

The first plant to run the complete integrated process, with NIRAS appointed for Pre-FEED and FEED.

5,000

t/yr of SAF

64,000

t/yr of RDF

2029

First production target

Project Genesis

Play video: Project Ascend: 32,000 t/yr SAF refinery

Project Ascend

Our first 32,000-tonne commercial facility.

Feasibility

The basis of the Deployment Blueprint for future plants.

32,000

t/yr of SAF

410,000

t/yr of RDF

2032

First production target

Project Ascend

Visualisation of a future Avioxx commercial plant

Commercial Deployment

The Deployment Blueprint, built at scale.

Future

A standardised plant, built wherever residual waste and fuel demand meet.

2035

UK plants from

2040s

International

32,000

t/yr per plant

Concept visualisation of the Project Eden modular plant

Separate concept

Project Eden

A modular plant for around 200 t/yr of SAF at airports and remote sites. Developed separately from our industrial programme.

Project Eden

Progress to date

What we have achieved.

All milestones

  1. Aug 2024Runcorn pilot facility operational
  2. Dec 2024First Fischer–Tropsch synthetic crude produced
  3. Feb 2025Electricity generated from syngas by solid oxide fuel cell
  4. Oct 2025NIRAS appointed as engineering partner
  5. Nov 2025DfT grant awarded for independent fuel testing
  6. Jan 2026NIRAS independent review of the Genesis design
  7. Feb 2026Independent laboratory analysis of our fuel
  8. 2026Feedstock supply agreement signed for Genesis