Project Catalyst

Our pilot facility in Runcorn.

Where the Avioxx process is developed, tested and improved, operating since August 2024.

2024

Operating since August

X25

Avioxx-designed reactor

1.5kW

SolydEra fuel cell

75m²

Facility footprint

Project Catalyst pilot facility, RuncornPlay video: Project Catalyst: SAF production update

The facility

The operating evidence behind our development.

  1. 01
    Fischer–Tropsch synthesis

    Avioxx-designed reactors on synthesised and waste-derived syngas.

  2. 02
    Fuel upgrading

    Hydroprocessing of product for independent laboratory analysis.

  3. 03
    Fuel-cell power

    Solid oxide fuel cell testing on synthesised syngas.

Location

The Heath Business & Technical Park.

A research park with a long history of chemical research and fuel innovation, close to the petrochemical industry of the Mersey estuary.

Inside the facility

The team at work.

Avioxx team members at the Project Catalyst pilot facility
Engineers controlling the Avioxx-designed Fischer–Tropsch reactor via its control system
Avioxx engineer working on the Fischer–Tropsch reactor
Engineer inspecting the reactor control system electronics

Runcorn pilot facility.

Development programme

From pilot to commercial deployment.

  1. Catalyst

    Pilot · Runcorn

    Operating since 2024

  2. Genesis

    5,000 t/yr

    In development · target 2029